Implementation of design works in the field of winemaking

Construction, construction, engineering
250b 50b

Preliminary condition study 50 GEL.

The most important thing is about the price

Competent design organizations, with their design solutions, can simply recoup the money spent on paying for their work.

Imaginary savings on project organizations, at the very beginning of the project, can be repaid in an uneducated, expensive and long project.

A frequent phenomenon of recent years: you pay cheaply and get a very "expensive project".

Choose professionals and we guarantee that your investment will pay off and bring the expected profit.

The cost of project works in terms of sector, winemaking-viticulture.

There are different ways to estimate the estimated cost of a project. Often, 1 sq.m. is taken as the basis of the cost of work. m of the designed building or structure, which, of course, is incorrect in terms of the level of complexity of the design object.

The cost of project work performed by our group is determined by taking into account the following main components:

object size;
object complexity;
Quantitative composition of project documentation sections;
The price is not calculated using formulas, but based on the actual costs of the project (specialists' salaries, overheads, taxes, etc.).

Considering the main components, the cost of the project can be 2-5% of the cost of the designed object. You should also take into account the direct proportional dependence of the project cost on its type: the greater the quantitative composition of the project documentation, the higher the percentage of the total cost of the object.

If the client comes only with ideas and an acceptable specification of the product, as well as a calculation of its price, and orders us to develop an enterprise that produces exactly the product that he needs and at the cost that he has taken into account. In this case, the price of project services is 8-12% of the total cost of the object, of which 42-52% of the total cost of the project is spent on technology development.

The cost of developing the main blocks of project documentation sections is:

Enterprise and on-site utilities master plan from 6% to 10% of the project cost;
Architectural and construction drawings from 28% to 38% of the project cost;
Technological solutions from 8% to 13% of the project cost;
engineering sections of the project from 32% to 42% of the project cost;
Special sections of the project from 8% to 18% of the project cost;

Implementation of design works